Site Visit

Luxury 3 & 4 BHK Apartments in Sasthamangalam, Trivandrum | Arcon Elite

One Apartment, One Entire Floor.

Download Brochure

Units

3 & 4 BHK Apartments

Address:

Pipinmood Jn., Sasthamangalam

K-RERA NUMBER :

K-RERA/PRJ/TVM/161/2022

Project Status

Ongoing

One Apartment, One Entire Floor.

Arcon Elite by Arcon Homes, redefines premium apartment living in Trivandrum with a rare concept designed around privacy, space, and exclusivity. Located in Pipinmood Jn., Sasthamangalam, this boutique high-rise rises across 12 floors with just 12 ultra-premium residences, one apartment on each floor - offering an experience that feels closer to owning a private villa in the sky than living in a conventional apartment.

Featuring spacious 3 & 4 BHK residences, Arcon Elite combines architectural elegance, refined interiors, rooftop lifestyle amenities, and exceptional connectivity to Kowdiar, Vellayambalam, Trivandrum Central Railway Station, and Trivandrum International Airport.

For those searching for luxury apartments in Trivandrum that value privacy as much as luxury, Arcon Elite delivers a lifestyle designed around individuality, sophistication, and freedom.

  • Premium 3 BHK Apartments
  • Exclusive 4 BHK Residences
  • One Apartment Per Floor
  • 12 Floors | 12 Residences
  • Spacious Balconies & Expansive Living Areas
  • Rooftop Lifestyle Amenities
  • RERA Approved Project

(K-RERA/PRJ/TVM/161/2022)

At Arcon Elite, luxury begins with space.

Step out of the elevator directly into a floor that belongs entirely to you; no shared hallways, no crowded common corridors, and no compromise on privacy. Every residence is thoughtfully crafted to create a sense of openness, calmness, and exclusivity rarely found in city apartments.

Large living spaces, expansive balconies, elegant interiors, and premium specifications come together to create homes that feel sophisticated yet deeply comfortable. Whether it’s hosting guests, unwinding after a long day, or simply enjoying the quietness of your own space, Elite creates an atmosphere where modern luxury feels effortless.

Located in the heart of Sasthamangalam, the project also offers the advantage of staying connected to Trivandrum’s major educational institutions, healthcare centers, shopping destinations, and city landmarks without losing the charm of peaceful residential living.

Image Title

Why Choose Arcon Elite?

  • Exclusive one apartment per floor concept
  • Premium 3 & 4 BHK residences
  • Located in the heart of Sasthamangalam
  • Excellent connectivity to Kowdiar, Vellayambalam & Major city landmarks
  • Privacy-focused boutique living experience
  • Spacious layouts with expansive balconies
  • Rooftop recreation & leisure spaces
  • Fully equipped AC gym
  • Multipurpose recreation hall
  • Elegant architecture with premium specifications
  • Easy access to schools, hospitals & city conveniences
  • Ideal for families seeking space, exclusivity, and comfort
  • Built by one of the trusted builders in Trivandrum

Image Title

Available Residences

3 BHK Apartments

Comfortable residences crafted for growing families and contemporary lifestyles.

4 BHK Apartments

Spacious premium homes designed for elevated family living and refined comfort.

Image Title
Image Title
Image Title
Image Title
Structure
  • RCC framed structure complying with seismic zone 3 designs and as per the structural design. Concrete grade and steel grade be as per structural consultant’s advice.
Doors & Windows
  • Entrance door – Teak Veneered Panelled Door with flush shutters
  • Internal doors – Hardwood door frame and flush door shutter.
  • Toilet doors – Engineered door frame with water resistant moulded shutter.
  • Hardware – All hardware will be in C.P/Brass.
  • Lock – Main Door shall be digital lock &Bed Room door Locks will be mortise of Godrej/Dorset/Ozone/Sifon make and Toilet Doors will have “dead” latch of Hafele/Ozone/Sifon
  • All regular windows, ventilators and balcony sliding doors will be powder coated aluminium with 5mm glass
Electrical
  •  Concealed copper wiring shall be done for lighting, fans, power points, AC points using RR cable/Havells Standard/Havells /Poly cab
  •  Wired provision for the water heater point and exhaust fan point shall be provided for all the apartment toilets
  •  Wired provision for telephone and internet point shall be provided in the living room & master bed room.
  •  Provision for cable TV/DTH in the living room & master bed room.
  •  Switches: Modular plate switches shall be provided Legrand (Lincus)/Schneider(Livia)/Havells(Fabio)
  •  Adequate ELCB and MCB shall be provided in each apartment using Legrand/Schneider/Havells.
  •  DG Power Back up : Power back up will be provided for all common service and selected light and fan points in living, bed rooms ,TV points and a refrigerator point shall be provided .power back up to maximum 1000W for each apartment. (AC point, water heater point and other16Ams point will not be considered for the power back up)
  •  Light Fixtures: For Common areas, Garden areas and at the top of Main entrance door of individual apartments
Sanitary & Plumbing
  •  Master Bed Room Toilet – Wall-hung EWC with concealed flush tanks. Vanity Counter and Wash bowls. All sanitary fittings shall be of QUEO/JAQUAR/ KOHLER/VITRA
  •  Other Bedroom Toilet – Wall hung EWC with concealed flush tanks, wall hung wash basin. All sanitary fittings shall be of QUEO/JAQUAR/KOHLER/VITRA
  •  Concealed Cistern (Concealed flushing system)– will be of GEBRIT/KOHLER/JAQUAR
  •  CP fittings of all toilets – single lever concealed diverter for shower and spout. Pillar tap shall be provided for washbasin, health faucet with angle valve shall be provided in all bathrooms. All fittings shall be of QUEO/JAQUAR/KOHLER/VITRA.
  •  Hot Water- Provision for hot water will be provided for all apartments’ overhead shower and spout only.
  •  Pipes: All supply lines will be with ISI marked CPVC/PVC pipes.
  •  Kitchen & Work Area: Wall mounted Faucets taps using JAGUAR/QUEO/KOHLER/VITRA brand.
  •  Kitchen Sink-Stainless Steel sink single bowl with drain board of ISI make for Kitchen, and stainless sink without drain board will be provided for the work area shall be of Prince/Metro.
  •  Accessories- Accessories like Towel rods, Soap Dish with C.P. finish will be provided inside the toilets. Towel ring shall be provided near dining washbasin
Flooring & Tiling + Railing
  •  Lift lobby and fascia using composite marble/granite/vitrified tile as per the architects design.
  •  Staircase using vitrified tile and hand railing using MS / G.I sections as per architects design.
  •  Car park Area: For Basement floor seamless VDF flooring with groove/exterior grade paving tile as per the architects design in specific areas. For Ground floor and First floor finished with cement mortar screeding with groove.
  •  Foyer/Living/Dining/Bed Rooms/Kitchen using 60cmx120cm vitrified tiles of KAJARIA/JOHNSON/QTONE/SOMANY/KERAMICA/SIMPOLO as per architects design.
  •  Toilets: Ceramic tile for floor and for walls up to door height as per architects design of KAJARIA/JOHNSON/SOMANY/KERAMICA/GRES GRANITO/SIMPOLO
  •  Balconies: Rustic or antiskid ceramic tiles and G.I railings as per architects design up to 1.20M minimum height
Painting
  • Regular wall Emulsion paint with putty finish using Asian / Berger / Nerolac in all apartments and in the common areas and utility services areas.
  • Regular ceiling emulsion paint Asian/ Berger / Nerolac for the ceiling inside apartments & common areas.
  • External Walls: Weather proof/exterior grade emulsion using Asian / Berger / Nerolac
Elevators
  • Elevators – 1 Nos. will be provided with automatic doors of OTIS/ JHONSON / THYSSENKRUP/FUJITEC/ESCON
Air Conditioning
  • Wired provision for installing split Air-conditioners will be provided for all bed rooms.
Automation
  • Access control entry at main entrance lobby area.
  • Gas leakage cut out valves will be provided in each apartment.
Landscaping
  • Interlock Pavers to be laid in driveways
  • Entrance Gate as per architect design
Water & Electricity
  • UG sump and overhead tank shall provide for drinking and non-drinking purposes.
  • Kerala Water Authority water connection can be made available at extra cost. The extra cost will include labour charges, material charges, deposits, tar cutting charges and all other relevant charges to take the connection from Kerala water Authority connection point to UG sump
  • 3 Phase electricity shall be provided.

05-03-2026

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor-11th floor slab -100%
 
Terrace floor slab-100%
 
CEILING PLASTERING
Ceiling plastering 1-11 th-100%
 
BLOCK WORK
2ND floor-4th Block work-100%
5TH floor-11th Block work-97%
 
INSIDE WALL PLASTERING
1ST FLOOR-90%
2nd FLOOR-100%
3RD-11th – 100%
Terrace-90%
 
EXTERNAL PLASTERING-100%
External plastering front upto terrace floor-100%
 
External plastering right side ground upto terrace floor-100%
 
External plastering backside  ground upto terrace floor-100%
 
External plastering  GF floor TO 5TH FLOOR-100%
 
External plastering left side ground upto terrace floor-100%
 
 
ELECTRICAL WORKS
ROPE PULLING-1ST TO 11TH FLOOR&TERRACE FLOOR-100%
WALL CHASING 1ST TO 11TH FLOOR-100%
WIRING-3RD FLOOR-5TH FLOOR,10th,11th-100%
 
SUNKEN PLASTERING
3RD TO11TH FLOOR TOILET SUNKENPLASTERING-100%
 
PLUMBING WORK
plumbing work    3rd to 8 th-100%
9TH FLOOR-90%
 
WATERPROOFING
 
waterproofing toilet-2Nd to 11th-100%
BALCONY-3RD&4TH FLOOR-100%
5th-11th-50%
 
PAINTING WORKS
PUTTY&PRIMER-
1ST FLOOR-80%
2ND FLOOR-11TH FLOOR-100%
 
FABRICATION WORK
2ND TO4TH FLOOR-50%
6th-11th-50%
 
TILE WORK
3B-95%
8E,7E,6E,5D-50%
 
ALUMINIUM WORK
3B-95%
 
DOOR INSTALLATION-3B-100%

05-02-2026

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor-11th floor slab -100%
 
Terrace floor slab-100%
 
CEILING PLASTERING
Ceiling plastering 1-11 th-100%
 
BLOCK WORK
2ND floor-4th Block work-100%
5TH floor-11th Block work-97%
 
INSIDE WALL PLASTERING
1ST FLOOR-90%
2nd FLOOR-95%
3RD-11th – 100%
Terrace-85%
 
EXTERNAL PLASTERING
External plastering front upto terrace floor-100%
 
External plastering right side ground upto terrace floor-100%
 
External plastering backside  ground upto terrace floor-100%
 
External plastering  GF floor TO 5TH FLOOR-30%
 
ELECTRICAL WORKS
ROPE PULLING-1ST TO 11TH FLOOR&TERRACE FLOOR-100%
WALL CHASING 1ST TO 11TH FLOOR-100%
WIRING-3RD FLOOR-5TH FLOOR-100%
 
SUNKEN PLASTERING
3RD TO11TH FLOOR TOILET SUNKENPLASTERING-100%
 
PLUMBING WORK
plumbing work    3rd to 8 th-100%
9TH FLOOR-90%
 
WATERPROOFING
 
waterproofing toilet-2Nd to 11th-100%
BALCONY-3RD&4TH FLOOR-100%
 
PAINTING WORKS
PUTTY&PRIMER-
1ST FLOOR-75%
2ND FLOOR-11TH FLOOR-100%
 
FABRICATION WORK
2ND TO4TH FLOOR-50%
 
TILE WORK
3B-90%
8E,7E,6E-50%
 
ALUMINIUM WORK
3B-95%

05-01-2026

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor-11th floor slab -100%
 
Terrace floor slab-100%
 
CEILING PLASTERING
Ceiling plastering 1-11 th-100%
 
BLOCK WORK
2nd floor-11th Block work-100%
 
INSIDE WALL PLASTERING
1ST FLOOR-75%
2nd FLOOR-60%
3RD-11th – 100%
 
EXTERNAL PLASTERING
External plastering front upto 5th floor-100%
 
External plastering right side upto 5th floor-100%
 
External plastering backside  upto 5th floor-100%
 
External plastering frontside 5th floor to Terrace-90%
 
External plastering right side 5th floor to terrace-50%
 
 
 
ELECTRICAL WORKS
ROPE PULLING-1ST TO 11TH FLOOR&TERRACE FLOOR-100%
WALL CHASING 1ST TO 11TH FLOOR-100%
WIRING-3RD FLOOR-5TH FLOOR-100%
 
PLUMBING WORK
plumbing work    3rd to 8 th-100%
9TH FLOOR-90%
 
WATERPROOFING
 
waterproofing toilet-2Nd to 11th-100%
BALCONY-3RD&4TH FLOOR-100%
 
PAINTING WORKS
PUTTY&PRIMER-
1ST FLOOR-75%
2ND FLOOR-11TH FLOOR-100%
 
FABRICATION WORK
3B-50%
 
TILE WORK
3B-90%
 
ALUMINIUM WORK
3B-95%

05-12-2025

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor-11th floor slab -100%
 
Terrace floor slab-100%
 
Ceiling plastering 2,3,4,5,6,7,8,9,10,11 th-100%
 
2nd floor-11th Block work-100%
 
 Wall  inside plastering 2nd-10th – 100%
 
Inside Plastering 6th,7th,8th,9th floor-100%
Water proofing 5th sunken -100%
 
Electrical rope pulling 2nd to 11th floor-100%
 
waterproofing toilet-3rd to 11th-100%
plumbing work    3rd to 11 th-20%
 
External plastering front upto 5th floor-100%
 
External plastering right side upto 5th floor-100%
 
External plastering backside  upto 5th floor-40%
 
Core cutting 3rd to 10th floor-100%
 
Parapet wall block work 1,2,5th floor-100%
 
lobby and staircase plastering-30%
 
Headroom&Pergola beam,OHT-100%
 
3B TILING-98%
 
Electrical wall chasing 3rd to 11 th-100%
 
 
Apartment putty & primer 2nd to 11th floor-100%

07-11-2025

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor-11th floor slab -100%
 
Terrace floor slab-100%
 
Ceiling plastering 2,3,4,5,6,7,8,9,10,11 th-100%
 
2nd floor-11th Block work-100%
 
 Wall  inside plastering 2nd-10th – 100%
 
Inside Plastering 6th,7th,8th,9th floor-100%

Water proofing 5th sunken -100%
 
Electrical rope pulling 2nd to 11th floor-100%
 
Putty Work-3rd,4th,6th,7th,8th-100%
 
External plastering front upto 5th floor-100%
 
External plastering right side upto 5th floor-100%
 
External plastering backside  upto 5th floor-40%
 
Core cutting 3rd to 10th floor-100%
 
Parapet wall block work 1,2,5th floor-100%
 
lobby and staircase plastering-20%
 
Headroom&Pergola beam,OHT-100%
 
3B TILING-98%
 
Electrical wall chasing 3rd to 11 th-100%
 
water proofing 3rd to 11th-100%
 
Apartment putty&primer 2nd to 11th floor-100%

04-10-2025

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor-11th floor slab -100%
 
Terrace floor slab-100%
 
Ceiling plastering 2,3,4,5,6,7,8,9,10,11 th-100%
 
2nd floor-11th Block work-100%
 
 Wall  inside plastering 2nd-10th – 100%
 
Inside Plastering 6th,7th,8th,9th floor-100%
 
Water proofing 3,4,,6,7,8,9,10th floor -progressing
Water proofing 5th sunken -100%
 
Electrical rope pulling 2nd to 11th floor-100%
 
Putty Work-3rd,4th,6th,7th,8th-100%
 
External plastering front upto 5th floor-100%
 
External plastering right side upto 5th floor-90%
 
External plastering backside  upto 5th floor-40%
 
Core cutting 3rd to 10th floor-90%
 
Parapet wall block work 1,2,5th floor-100%
 
lobby and staircase plastering-20%
 
Headroom&Pergola beam,OHT-100%
 
3B TILING-90%

05-08-2025

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor slab -100%
 
First Floor Slab – 100%
 
Second Floor Slab – 100%
 
Third Floor Slab – 100%
 
Forth Floor Slab – 100%
 
Fifth Floor Slab – 100%
 
Sixth Floor Slab – 100%
 
Seventh Floor Slab – 100%
 
Eight floor slab-100%
 
Ninth Floor slab-100%
 
Tenth floor slab-100%
 
11TH floor slab-100%
 
Terrace floor slab-100%
 
Ceiling plastering 2,3,4,5,6,7,8,9,10 th-100%
 
2nd floor-4th Block work-100%
 
5th floor-60%
 
6th-11th floor block work-100%
 
Wall plastering 2A,- 100%
 Wall plastering3rd,(3B&3C),4th(4B&4C)- 100%
 
Inside Plastering 6th,7th,8th,9th floor-100%
 
Water proofing 3rd 4th floor -75%
Water proofing 5th sunken -100%
 
2nd-4th&6th-10th floor wall chasing-100%
 
Electrical rope pulling 2nd to 11th floor-100%
 
Putty Work-3rd,4th,6th-100%
 
11th floor ceiling plastering-100%
 
External plastering front upto 5th floor-100%
 
Core cutting 3rd to 6th floor-90%
 
Putty work 3rd,4th&6th floor-100%
 
Parapet wall block work 1,2,5th floor-100%
 
lobby and staircase piping-100%
 
Headroom & Pergola beam-100%

06-07-2025

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor slab -100%
 
First Floor Slab – 100%
 
Second Floor Slab – 100%
 
Third Floor Slab – 100%
 
Forth Floor Slab – 100%
 
Fifth Floor Slab – 100%
 
Sixth Floor Slab – 100%
 
Seventh Floor Slab – 100%
 
Eight floor slab-100%
 
Ninth Floor slab-100%
 
Tenth floor slab-100%
 
11TH floor slab-100%
 
Terrace floor slab-100%
 
Ceiling plastering 2,3,4,5,6,7,8,9,10 th-100%
 
2nd floor-4th Block work-100%
 
5th floor block work-60%
 
6th-10th floor block work-100%
 
Wall plastering 2A,- 100%
 
Wall plastering 6th ,7th,8th floor – 90%
 
Water proofing 5th sunken – 100%
 
2nd-4th&6th-10th floor wall chasing – 100%
 
Putty Work-3rd,4th,6th – 60%

04-06-2025

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor slab -100%
 
First Floor Slab – 100%
 
Second Floor Slab – 100%
 
Third Floor Slab – 100%
 
Forth Floor Slab – 100%
 
Fifth Floor Slab – 100%
 
Sixth Floor Slab – 100%
 
Seventh Floor Slab – 100%
 
Eight floor slab-100%
 
Ninth Floor slab-100%
 
Tenth floor slab-100%
 
11TH floor slab-100%
 
Terrace floor slab-100%
 
Ceiling plastering 2,3,4,5,6,7,8,9,10 th-100%
 
2nd floor-4th Block work-100%
 
5th floor block work-60%
 
6th-9th floor block work-100%
 
10th floor block work-90%
 
Wall plastering 2A,- 100%
 Wall plastering 3B- 50%
Water proofing 5th sunken 100%
 
2nd-4th&6th,7th floor wall chasing-100%

04-05-2025

Piling  Work – 100%
 
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor slab -100%
 
First Floor Slab – 100%
 
Second Floor Slab – 100%
 
Third Floor Slab – 100%
 
Forth Floor Slab – 100%
 
Fifth Floor Slab – 100%
 
Sixth Floor Slab – 100%
 
Seventh Floor Slab – 100%
 
Eight floor slab-100%
 
Ninth Floor slab-100%
 
Tenth floor slab-100%
 
11TH floor slab-100%
 
Terrace floor slab-90%
 
Ceiling plastering 2,3,4,5,6,7,8,9-100%
 
2nd floor Block work-95%
 
3rd floor block work-95%
 
4th floor block work-95%
 
5th floor block work-95%
 
6th-8th floor block work-95%
 
9th floor block work-100%
 
Wall plastering 2A,- 100%

 Wall plastering 3B- 50%

Water proofing 5th sunken 100%

02-04-2025

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor slab -100%
 
First Floor Slab – 100%
 
Second Floor Slab – 100%
 
Third Floor Slab – 100%
 
Forth Floor Slab – 100%
 
Fifth Floor Slab – 100%
 
Sixth Floor Slab – 100%
 
Seventh Floor Slab – 100%
 
Eight floor slab-100%
 
Ninth Floor slab-100%
 
Tenth floor slab-100%
 
11TH floor slab-100%
 
Ceiling plastering 2,3,4,5,6,7,8-100%
 
2nd floor Block work-95%
 
3rd floor block work-95%
 
4th floor block work-95%
 
5th floor block work-95%
 
6th-8th floor block work-95%
 

04-03-2025

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor slab -100%
 
First Floor Slab – 100%
 
Second Floor Slab – 100%
 
Third Floor Slab – 100%
 
Forth Floor Slab – 100%
 
Fifth Floor Slab – 100%
 
Sixth Floor Slab – 100%
 
Seventh Floor Slab – 100%
 
Eight floor slab-100%
 
Ninth Floor slab-100%
 
Tenth floor slab-100%
 
Ceiling plastering 2,3,4,5,6,7-100%
 
2nd floor Block work-40%
 
3rd floor block work-100%
 
4th floor block work-60%

03-02-2025

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor slab -100%
 
First Floor Slab – 100%
 
Second Floor Slab – 100%
 
Third Floor Slab – 100%
 
Forth Floor Slab – 100%
 
Fifth Floor Slab – 100%
 
Sixth Floor Slab – 100%
 
Seventh Floor Slab – 100%
 
Eight floor slab-100%
 
Ninth Floor slab-progressing 
 
Ceiling plastering 2,3,4-100%
 
Ceiling plastering-5th floor-70%

02-01-2025

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100% 
 
Grade slab -100%
 
Ground floor slab -100%
 
First Floor Slab – 100%
 
Second Floor Slab – 100%
 
Third Floor Slab – 100%
 
Forth Floor Slab – 100%
 
Fifth Floor Slab – 100%
 
Sixth Floor Slab – 100%
 
Seventh Floor Slab – 100%
 
Eighth Floor Slab-10%

08-11-2024

Piling  Work – 100%
 
Pile cap work  – 100%
 
Plinth beam-100%
 
Ground floor slab -100%
 
First Floor Slab – 100%
 
Second Floor Slab – 100%
 
Third Floor Slab – 100%
 
Fourth Floor Slab – 100%
 
Fifth Floor Slab – 100%
 
Sixth Floor Slab – 100%
 
Seventh Floor Slab – 30%
 
Electrical rope pulling-
 
First floor – 100%
 
Second floor – 100%
 
Third floor – 50%

08-11-2024

Piling work – 100%
 
Pile Cap work – 100%
 
Pile chipping – 100%
 
Plinth beam – 100%
 
Ground floor column work – 100%
 
Ground floor Slab work-100%
 
First Floor column – 100%
 
Second floor slab -100%
 
Third floor slab – 100%
 
   Fourth floor slab – 100% 
 
   Fifth floor slab – 100%

03-10-2024

Piling work – 100%
 
Pile Cap work – 100%
 
Pile chipping – 100%
 
Plinth beam – 100%
 
Ground floor column work – 100%
 
Ground floor Slab work-100%
 
First Floor column – 100%
 
Second floor slab -100%
 
Third floor slab – 100%
 
Fourth floor slab – 100% 
 
Fifth floor slab – ongoing
 

10-07-2024

Piling work – 100%
 
Pile Cap work – 100%
 
Pile chipping – 100%
 
Plinth beam – 100%
 
Ground floor column work – 100%
 
Ground floor Slab work-100%
 
First Floor column – 100%
 
Second floor slab -100%
 
Third floor slab – 100%
 

06-06-2024

Piling work – 100%

Pile Cap work – 100%

Pile Chipping – 100%

Plinth Beam – 100%

Ground Floor Column Work – 100%

Ground Floor Slab Work – 100%

First Floor Column – 80%

04-05-2024

Piling work – 100%

Pile Cap work – 100%

Pile Chipping – 100%

Plinth Beam – 100%

Ground Floor Column Work – 100%

Ground Floor Slab Work – 75%

27-03-2024

Piling work – 100%

Pile Cap work – 100%

Pile Chipping – 100%

Plinth Beam – 100%

Ground Floor Column Work – 70%

07-02-2024

Piling work – 100%

Pile Cap work – 70%

Pile Chipping – 80%

Earthwork – 80%

08-09-2023

Piling work – 100%

A Location That Keeps You Close to Everything

  • Kowdiar Junction – Nearby
  • Sasthamangalam Junction – Nearby
  • Neyyar Polyclinic – 50 m
  • Trivandrum Medical Centre – 700 m
  • SP Well Fort Hospital – 1.3 km
  • Legislative Assembly – 3.8 km
  • Secretariat – 4.7 km
  • Kanakakkunnu Palace – 3.3 km
  • Christ Nagar Central School – 2.8 km
  • Cotton Hill Girls HSS – 2.8 km
  • University College – 2.3 km
  • University Institute of Technology – 2.3 km
  • Baselios College of Engineering – 6.6 km
  • Sree Mahadevar Temple – 350 m
  • Sree Bhadrakali Devi Temple – 400 m
  • St. Gregorios Orthodox Church – 2.5 km
  • Vazhuthacaud Juma Masjid – 2.9 km
  • Napier Museum – 3.9 km
  • Lulu Mall – 9.8 km
  • Trivandrum Central Railway Station – 5.5 km
  • Trivandrum International Airport – 8.2 km

Arcon Elite offers a rare one apartment per floor concept that ensures exceptional privacy, exclusivity, and spacious living, something rarely available in conventional apartment projects.

Arcon Elite is located in Pipinmood Jn., Sasthamangalam, one of the most premium and well-connected residential locations in Trivandrum.

The project offers spacious 3 BHK and 4 BHK premium residences with expansive living areas and balconies.

Yes. The spacious layouts, privacy-focused planning, premium residential location, and modern amenities make it ideal for families seeking refined urban living.

Arcon Elite offers easy access to Kowdiar, Vellayambalam, major hospitals, educational institutions, Trivandrum Central Railway Station, and the International Airport.

Yes. The project includes rooftop recreation spaces, a fully equipped AC gym, multipurpose hall, premium common areas, and secure parking facilities.

Get in touch

Fill out this form and one of our agents will be in touch with you soon.

Contact Me

Schedule a showing?
Sold out
Completed
Call
Email
Sold out
Completed
Call
Email
Sold out
Completed
Call
Email
Sold out
Completed
Call
Email
Sold out
Completed
Call
Email
Ready to Occupy
Call
Email
Ongoing
Call
Email
Ongoing
Call
Email

Compare Listings

Arcon Home Builders Pvt Ltd