arcon-serene-post-thumb
PROJECT TYPE :
New Launch Projects
PROJECT CATEGORY :
Premium Luxury Apartment
PROJECT LOCATION :
Nanthencodu, Trivandrum
DISTRICT :
Thiruvananthapuram
PERMIT NUMBERS :
E14/BA/54259/22
K-RERA NUMBER :
K-RERA/PRJ/TVM/105/2023

ARCON HOMES (ISO 9001 :2015 Certified builder) is one of the fastest growing real estate companies and top builders in Kerala. Nestled in the heart of Trivandrum in Nanthencodu, this luxurious apartment project aims to redefine modern living with all facilities conveniently located nearby. Take delight in our spacious and thoughtfully planned layouts that cater to the needs and desires of every discening homeowners.

Whether you are seeking a cozy one-bedroom haven or a sprawling penthouse, we offer a range of options to suit your preferences in this project. If you are looking to stay in a premium flat in Trivandrum, we have exclusive amenities like a dedicated kids’ play area and a landscaped rooftop party space. Designed for comfort, convenience, and family happiness. Experience a lifestyle that truly feels like home! Join us as we celebrate the grand unveiling of the “ARCON SERENE” – a residential haven for those who appreciate the extra ordinary.

Structure
  • RCC framed structure complying with seismic zone 3 designs and as per the structural design. Concrete grade and steel grade be as per structural consultant’s advice.
Doors & Windows
  • Entrance door – Teak Veneered Paneled Door with flush shutters
  • Internal doors – Hardwood door frame and flush door shutter.
  • Toilet doors – Engineered door frame with water resistant moulded shutter.
  • Hardware – All hardware will be in C.P/Brass.
  • Lock – Main Door shall be digital lock of Godrej/Dorset/Yale. Bed Room door Locks will be mortise of Godrej/Dorset and Toilet Doors will have
    “dead” latch of Dorset/Hafele/Ozone
  • All regular windows, ventilators and balcony sliding doors will be powder coated aluminium with 5mm glass
Electrical
  • Concealed copper wiring shall be done for lighting, fans, power points, AC points using RR cable/Havells Standard/Havells /Poly cab
  • Wired provision for the water heater point and exhaust fan point shall be provided for all the apartment toilets
  • Wired provision for telephone and internet point shall be provided in the living room & master bed room.
  • Wired provision for cable TV/DTH in the living room & master bed room.
  • Switches: Modular plate switches shall be provided Legrand (Lincus)/Schneider(Livia)/Havells(Fabio)
  • Adequate ELCB and MCB shall be provided in each apartment using Legrand/Schneider/Havells.
  • DG Power Back up : Power back up will be provided for all common service and selected light and fan points in living, bed rooms ,TV points and a refrigerator point shall be provided .power back up to maximum 1000W for each apartment. (AC point, water heater point and other16Ams point will not be considered for the power back up)
  • Light Fixtures: For Common areas, Garden areas and at balconies of individual apartments
Sanitary & Plumbing
  • Master Bed Room Toilet – Wall-hung EWC with concealed flush tanks. Vanity Counter and Wash bowls. All sanitary fittings shall be of QUEO/JAQUAR/KOHLER
  • Other Bedroom Toilet – Wall hung EWC with concealed flush tanks, wall hung wash basin. All sanitary fittings shall be of QUEO/JAQUAR/KOHLER
  • Concealed Cistern (Concealed flushing system)– will be of GEBRIT/KOHLER/JAQUAR
  • CP fittings of all toilets – single lever concealed diverter for shower and spout. Pillar tap shall be provided for washbasin, health faucet with angle valve shall be provided in all bathrooms. All fittings shall be of QUEO/JAQUAR/KOHLER/VITRA/HANSGROHE
  • Hot Water- Provision for hot water will be provided for all apartments’ overhead shower and spout only
  • Pipes: All supply lines will be with ISI marked CPVC/PVC pipes.
  • Kitchen & Work Area: Wall mounted Faucets taps using JAQUAR/QUEO/KOHLER/VITRA/HANSGROHE brand.
  • Accessories- Accessories like Towel rods, Soap Dish with C.P. finish will be provided inside the toilets. Towel ring shall be provided near dining washbasin
Flooring & Tiling + Railing
  • Lift lobby and fascia using composite marble/granite/vitrified tile as per the architects design.
  • Staircase using vitrified tile and hand railing using MS / G.I sections as per architects design.
  • Car park Area: For Basement floor seamless VDF flooring with groove/exterior grade paving tile as per the architects design in specific areas. For Ground floor and First floor finished with cement mortar screeding with groove.
  • Foyer/Living/Dining/Bed Rooms/Kitchen using 60cmx120cm vitrified tiles of KAJARIA/JOHNSON/QTONE/SOMANY/KERAMICA/SIMPOLO as per architects design.
  • Toilets: Ceramic tile for floor and for walls up to door height as per architects design of KAJARIA/JOHNSON/SOMANY/KERAMICA/GRES GRANITO/SIMPOLO
  • Balconies: Rustic or antiskid ceramic tiles and toughened glass railing as per architects design up to 1.20M minimum height
Painting
  • Premium wall Emulsion paint with putty finish using Asian/Berger/Jotun in all apartments and in the common areas and utility services areas.
  • Premium ceiling emulsion paint Asian/ Berger/ Jotun for the ceiling inside apartments & common areas.
  • External Walls: Weather proof/exterior grade emulsion using Asian/Berger/Jotun
Kitchen Counter
  • For the better utilisation of interior work we will not provide counter top with granite in kitchen and work area, Our scope of works as follows
  • We will supply single bowl sink with one side drain board in kitchen and single bowl sink without drain board in work area, fixing of the same is in the scope of customer.
  • Proposed counter height is 85cm from the finished floor level we will supply and fix the dado tile in kitchen and work area at 60cm from the proposed counter top level as counter location specified in the brochure plan
Elevators
  • Elevators – 2 Nos. will be provided with automatic doors of JHONSON / THYSSENKRUP/FUJITEC/KONE/SCHINDLER
Air Conditioning
  • Wired provision for installing split Air-conditioners will be provided for all bed rooms and living room.
Automation
  • Access control entry at main entrance lobby area.
  • Gas leakage detection system and cut out valves will be provided in each apartment.
Landscaping
  • Interlock Pavers to be laid in driveways
  • Entrance Gate as per architect design
Water & Electricity
  • UG sump and overhead tank shall provide for drinking and non-drinking purposes.
  • Kerala Water Authority water connection can be made available at extra cost. The extra cost will include labour charges, material charges, deposits, tar cutting charges and all other relevant charges to take the connection from Kerala water Authority connection point to UG sump.
  • 3 Phase electricity shall be provided.

Amenities & Features

  • Landscaped roof top party area.

  • Fully equipped air - conditioned gym with 1Nos Motorized tread mill, 1No. Elliptical cross trainer, 1Nos cycling machine and 1No home gym.

  • Roof top swimming pool.

  • Roof top kids pool.

  • Kids play area with play equipments.

  • Car parking for differently abled.

  • Two automatic elevators with rescue device.

  • Biometric access at main lobby area.

  • CCTV surveillance cameras in key areas.

  • Generator back - up for common areas and designated points in the apartment.

  • Provision for Round the clock security.

  • Solar powered lights for lobby areas.

  • DTH / cable provision in living and master bedroom.

  • Intercom facility between apartments and the security cabin.

  • Public drainage connection for sewage.

  • Bio bins for solid waste management.

  • Provision for Wi-Fi internet.

  • Individual letter boxes.

  • Owners name board.

  • Reticulated gas supply.

  • Multipurpose Hall.

  • Car charging provision for individual car parking @(Extra cost)

03-10-2024

Piling Work – 100%
 
Pile cap work – 100%
 
Grade slab -100%
 
Ground floor slab -100%
 
First Floor Slab – 100%
 
Second Floor Slab – ongoing
 

10-07-2024

Piling Work – 100%
 
Pile cap work – 98%
 
Grade slab -100%
 
Grade slab PCC – 100%
 
Ground floor slab shuttering and steel works ongoing
 

06-06-2024

Piling Work – 100%

Pile Cap Work – 95%

Grade Slab – 45%

Retaining Wall – 65%

Grade Slab PCC – 75%

04-05-2024

Piling Work – 100%

Pile Cap Work – 95%

Grade Slab – 45%

27-03-2024

Piling Work – 100%

Pile Cap Work – 86%

Plinth Beam – 15%

07-02-2024

Piling Work – 100%

Pile chipping work – 30%

15-11-2023

Piling Work – 100%

Earth Excavation Work – 5%

19-10-2023

Piling Work – 100%

08-09-2023

Piling Work – 38%

Project Status