elite-overview-1
PROJECT TYPE :
Ongoing Projects
PROJECT CATEGORY :
Premium Luxury Apartment
PROJECT LOCATION :
Pipinmood Jn., Sasthamangalam
DISTRICT :
Thiruvananthapuram
PERMIT NUMBERS :
E5/BA/19622/21
K-RERA NUMBER :
K-RERA/PRJ/TVM/161/2022

ARCON HOMES (ISO 9001 :2015 Certified builder) one of the fastest growing real estate companies in Kerala. Presenting, ARCON ELITE yet another project with the prestigious line up of Arcon Homes. True to its name, Arcon Elite blends the entire elements of an exotic living into the benefits of staying in the most sought-after location in Sasthamangalam, Trivandrum. So go ahead, grab your piece of exotic life.

Arcon Elite is as unique as previous projects with architectural innovations and incredible quality. Sprawled across 18 cents Arcon Elite stands magnificently ascending 12 floors with 12 apartments featuring 3BHK and 4BHK residences – one on each floor. Arcon Elite is a blend of timeless elegance, class, quality and sophistication that assures an ultimate fine living experience. It helps to entice your desires, it inspires to unwind your inner self and it narrates your dreams.

Structure
  • RCC framed structure complying with seismic zone 3 designs and as per the structural design. Concrete grade and steel grade be as per structural consultant’s advice.
Doors & Windows
  • Entrance door – Teak Veneered Panelled Door with flush shutters
  • Internal doors – Hardwood door frame and flush door shutter.
  • Toilet doors – Engineered door frame with water resistant moulded shutter.
  • Hardware – All hardware will be in C.P/Brass.
  • Lock – Main Door shall be digital lock &Bed Room door Locks will be mortise of Godrej/Dorset/Ozone/Sifon make and Toilet Doors will have “dead” latch of Hafele/Ozone/Sifon
  • All regular windows, ventilators and balcony sliding doors will be powder coated aluminium with 5mm glass
Electrical
  •  Concealed copper wiring shall be done for lighting, fans, power points, AC points using RR cable/Havells Standard/Havells /Poly cab
  •  Wired provision for the water heater point and exhaust fan point shall be provided for all the apartment toilets
  •  Wired provision for telephone and internet point shall be provided in the living room & master bed room.
  •  Provision for cable TV/DTH in the living room & master bed room.
  •  Switches: Modular plate switches shall be provided Legrand (Lincus)/Schneider(Livia)/Havells(Fabio)
  •  Adequate ELCB and MCB shall be provided in each apartment using Legrand/Schneider/Havells.
  •  DG Power Back up : Power back up will be provided for all common service and selected light and fan points in living, bed rooms ,TV points and a refrigerator point shall be provided .power back up to maximum 1000W for each apartment. (AC point, water heater point and other16Ams point will not be considered for the power back up)
  •  Light Fixtures: For Common areas, Garden areas and at the top of Main entrance door of individual apartments
Sanitary & Plumbing
  •  Master Bed Room Toilet – Wall-hung EWC with concealed flush tanks. Vanity Counter and Wash bowls. All sanitary fittings shall be of QUEO/JAQUAR/ KOHLER/VITRA
  •  Other Bedroom Toilet – Wall hung EWC with concealed flush tanks, wall hung wash basin. All sanitary fittings shall be of QUEO/JAQUAR/KOHLER/VITRA
  •  Concealed Cistern (Concealed flushing system)– will be of GEBRIT/KOHLER/JAQUAR
  •  CP fittings of all toilets – single lever concealed diverter for shower and spout. Pillar tap shall be provided for washbasin, health faucet with angle valve shall be provided in all bathrooms. All fittings shall be of QUEO/JAQUAR/KOHLER/VITRA.
  •  Hot Water- Provision for hot water will be provided for all apartments’ overhead shower and spout only.
  •  Pipes: All supply lines will be with ISI marked CPVC/PVC pipes.
  •  Kitchen & Work Area: Wall mounted Faucets taps using JAGUAR/QUEO/KOHLER/VITRA brand.
  •  Kitchen Sink-Stainless Steel sink single bowl with drain board of ISI make for Kitchen, and stainless sink without drain board will be provided for the work area shall be of Prince/Metro.
  •  Accessories- Accessories like Towel rods, Soap Dish with C.P. finish will be provided inside the toilets. Towel ring shall be provided near dining washbasin
Flooring & Tiling + Railing
  •  Lift lobby and fascia using composite marble/granite/vitrified tile as per the architects design.
  •  Staircase using vitrified tile and hand railing using MS / G.I sections as per architects design.
  •  Car park Area: For Basement floor seamless VDF flooring with groove/exterior grade paving tile as per the architects design in specific areas. For Ground floor and First floor finished with cement mortar screeding with groove.
  •  Foyer/Living/Dining/Bed Rooms/Kitchen using 60cmx120cm vitrified tiles of KAJARIA/JOHNSON/QTONE/SOMANY/KERAMICA/SIMPOLO as per architects design.
  •  Toilets: Ceramic tile for floor and for walls up to door height as per architects design of KAJARIA/JOHNSON/SOMANY/KERAMICA/GRES GRANITO/SIMPOLO
  •  Balconies: Rustic or antiskid ceramic tiles and G.I railings as per architects design up to 1.20M minimum height
Painting
  • Regular wall Emulsion paint with putty finish using Asian / Berger / Nerolac in all apartments and in the common areas and utility services areas.
  • Regular ceiling emulsion paint Asian/ Berger / Nerolac for the ceiling inside apartments & common areas.
  • External Walls: Weather proof/exterior grade emulsion using Asian / Berger / Nerolac
Elevators
  • Elevators – 1 Nos. will be provided with automatic doors of OTIS/ JHONSON / THYSSENKRUP/FUJITEC/ESCON
Air Conditioning
  • Wired provision for installing split Air-conditioners will be provided for all bed rooms.
Automation
  • Access control entry at main entrance lobby area.
  • Gas leakage cut out valves will be provided in each apartment.
Landscaping
  • Interlock Pavers to be laid in driveways
  • Entrance Gate as per architect design
Water & Electricity
  • UG sump and overhead tank shall provide for drinking and non-drinking purposes.
  • Kerala Water Authority water connection can be made available at extra cost. The extra cost will include labour charges, material charges, deposits, tar cutting charges and all other relevant charges to take the connection from Kerala water Authority connection point to UG sump
  • 3 Phase electricity shall be provided.

Amenities & Features

  • Landscaped roof top party area.

  • Fully equipped air - conditioned gym with 1Nos Motorized tread mill, 1 No. Elliptical cross trainer, 1Nos cycling machine and 1No home gym

  • Designer Entrance Lobby.

  • Car parking for differently abled.

  • One automatic elevator with rescue device.

  • Biometric access at main lobby area.

  • CCTV surveillance cameras in key areas.

  • Provision for Round the clock security.

  • Solar powered lights for lobby areas.

  • Generator back - up for common areas and designated points in the apartment.

  • DTH / cable provision in living and master bedroom.

  • Intercom facility between apartments and the security cabin.

  • Public drainage connection for sewage.

  • Bio bins for solid waste management.

  • Provision for Wi-Fi internet.

  • Individual letter boxes.

  • Owners name board.

  • Reticulated gas supply

  • Association Room

  • Car charging provision for individual car parking (Extra cost)

03-10-2024

Piling work – 100%
 
Pile Cap work – 100%
 
Pile chipping – 100%
 
Plinth beam – 100%
 
Ground floor column work – 100%
 
Ground floor Slab work-100%
 
First Floor column – 100%
 
Second floor slab -100%
 
Third floor slab – 100%
 
Fourth floor slab – 100% 
 
Fifth floor slab – ongoing
 

10-07-2024

Piling work – 100%
 
Pile Cap work – 100%
 
Pile chipping – 100%
 
Plinth beam – 100%
 
Ground floor column work – 100%
 
Ground floor Slab work-100%
 
First Floor column – 100%
 
Second floor slab -100%
 
Third floor slab – 100%
 

06-06-2024

Piling work – 100%

Pile Cap work – 100%

Pile Chipping – 100%

Plinth Beam – 100%

Ground Floor Column Work – 100%

Ground Floor Slab Work – 100%

First Floor Column – 80%

04-05-2024

Piling work – 100%

Pile Cap work – 100%

Pile Chipping – 100%

Plinth Beam – 100%

Ground Floor Column Work – 100%

Ground Floor Slab Work – 75%

27-03-2024

Piling work – 100%

Pile Cap work – 100%

Pile Chipping – 100%

Plinth Beam – 100%

Ground Floor Column Work – 70%

07-02-2024

Piling work – 100%

Pile Cap work – 70%

Pile Chipping – 80%

Earthwork – 80%

08-09-2023

Piling work – 100%

Project Status